Construction Materials Allowable Wastage Percentages

Q.We delivered concrete to a poured wall contractor building residential foundations in a subdivision.He says we shorted him about 14 yard per 9-yard load.I ran a unit weight test on the fresh concrete and divided the total batch weight by the unit weight.The yield came out to be exactly 27.